DER Impact Evaluation

CYME_DER1.jpg

The acceleration of distributed energy resources (DER) deployment imposes new challenges to electric distribution utilities. Handling the volume of interconnection applications and assessing the effects of each new installation on the distribution system require dedicated resources and tools. The CYME DER Impact Evaluation module enable engineers to perform generation interconnection system impact studies within minutes rather than hours through the automation of a series of repetitive, time-consuming and error-prone verifications.